The water main relocation and sanitary sewer rehabilitation project included rerouting existing water mains from within existing sanitary sewer gravity mains and manholes and repairing the sewer manholes and/or gravity mains. The project included addressing conflicts at approximately 60 different locations within the City of Mobile, most of which were located downtown.
GMC is one of the most comprehensive multi-disciplined architecture and engineering firms in the Southeast.
Or email: bids@gmcnetwork.com