About GMC Charleston

GMC's Charleston office is located on the ground floor of the Charleston Tech Center, a hub for creative and tech businesses. The office is located in North of Morrison (NOMO), one of the fastest up-and-coming areas on the Charleston peninsula and adjacent to the city’s historic district. With numerous nearby amenities including fitness centers, breweries, bars and restaurants within a one-mile radius, our team is able to enjoy a work/life balance.

Charleston Office Leader

Vice President, Architecture

Charleston Culture

1 Charleston
Charleston Christmas Photostrip Picture 1 - Copy
Charleston Camp Happy Days frame

Charleston Projects

GMC was secured by Laurens County Water and Sewer Commission (LCWSC) to evaluate alternatives to incorporate the new surface water treatment plant on Lake Greenwood into their existing distribution system.
The new water treatment plant and raw water intake on Lake Greenwood were awarded in two phases: Phase I consisted of an evaluation to define the design conditions, and Phase II consisted of executing the design. Defining the design conditions in Phase I consisted of population and flow projections, public involvement, permitting, hydraulic analysis as well as piloting of four treatment technologies.
Lakeside Lodge features a four-story resort condo complex with 118 units. The condos are a mixture of studios and one-, two-, and three-bedrooms.
GMC was secured by Grand Strand Water and Sewer Authority (GSWSA) to evaluate treatment and/or transmission alternatives to allow the GSWSA Bull Creek service area to meet 2040 demands. The Bull Creek distribution system includes a 45 MGD surface water treatment plant, approximately 9,700,000-linear-feet of transmission and distribution piping, 9 booster pump stations, 4 blend wells, 17 aquifer storage and recovery (ASR) wells, and approximately 85,900 customer connections.
GMC completed a study (Phase I) for the Horse Creek Pollution Control Facility and a design (Phase II) based on the findings of the study. This process provided a confident course of action for the utility. As a result of the project, the facility now has a primary design capacity of 26 MGD with a peak of 65 MGD and a secondary capacity of 20 MGD with a peak of 40 MGD, utilizing a 20-MG offline equalization basin.
Millbrook Elementary School is an existing, 800 student elementary school that was originally constructed in the 1950s and has grown and changed over time. This project is intended to reimagine the campus and bring the school into the 21st century by removing the original buildings and connecting two existing buildings with a new addition. Renovations totaled 6,000-square-feet and new additions were 26,000-square-feet.
Charleston Office News