CWSRF Elmore County Public Works Lift Station & Force Main Improvements
Project # CMGM230096(3)
- Owner
- Wetumpka Water Works & Sewer Board
- Location
- Wetumpka, Alabama
- Bid Date
- December 19, 2024 10:00 am
- Bid Type
- Sealed Bid
- Price Range
- $550,000.00 - $650,000.00
- List of Bidders
- Slaughter Construction Co. Inc. slaucon@slaughterconstruction.com 251.979.6171
Jordan Excavating Company, LLC rusty@jordan-excavating.com 205.987.0534
J&P Construction Company Inc. adesch@jandpconstruction.com 205-345-6631
CAM Construction LLC - camconstructionllc2@gmail.com 334 375 5201
Haren Construction Company, Inc. cosborne@harenconstruction.com 423.263.5561
Templeton & Associates m@templeton-associates.com 770-614-8550
Hart Services of Eclectic LLC jason7hart@hotmail.com 334-651-1059
Associated Mechanical Contractors, Inc. poliver@amcoinc.com 334-264-2263 - Contact for Obtaining Bid Documents
- Download the Plan Order form located in the Bid Advertisement below. Complete the form and return via email to Ashley.Morris@gmcnetwork.com with a scanned copy of your plan deposit check. Check should be mailed to the Mobile, AL office of GMC. No credit cards are accepted.
- Additional Bid Information
- The entire Project Manual does not have to be submitted with the Bid. Do not staple any portion of the bid, all documents should be submitted unbound.
This project is being funded by SRF Project No. FS010460-06 and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after the bid opening. Prime contractor must solicit DBE subcontractors, if they are planning to use subs. DBE solicitations should be documented, preferably with a summary table of DBEs contacted, along with the supporting correspondence (email, letter, etc.) and responses from those subs contacted.
All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States (“American Iron and Steel Requirement”). - Download Documents