2022 CWSRF Sanitary Sewer Rehabilitation & Replacement
Project # CMGM220156(3)
- Owner
- The Town of Camp Hill, Alabama
- Location
- Camp Hill, Alabama
- Bid Date
- March 13, 2025 10:00 am
- Bid Type
- Sealed Bid
- Price Range
- $4,000,000.00 - $5,000,000.00
- List of Bidders
- Slaughter Construction Company Inc. - slaucon@slaughterconstruction.com 251.948.7222
Causey Underground Construction LLC - office@cuc-llc.com 334.371.6991
Hutchins Services, LLC - derrick@hutchinsservices.com 256-404-5376
Resinating LLC - calcordulack@resinatingllc.com 203-820-1043
Emergia, Inc. - emergiallc@gmail.com 6630-877-3408
Gulf Coast Underground, LLC - ddavis@gogcu.com 251-725-0200
SAK Construction, LLC - bidcippe@sakcon.com 636-385-1080
Insituform Technologies LLC - insituformsales@azuria.com 985-507-2023
REV Construction, Inc. - mtucker@revconstructioninc.com 205-349-1860
South Alabama Contracting, LLC - salabamaconllc@outlook.com 334-222-3472
Inliner Solutions, LLC - bids@puriscorp.com 470-939-0142
Gainey's Concrete Products, LLC - britt@gaineysconcrete.com 225-567-2700
Video Industrial Services, Inc. - dmahan@videoindustrial.com 205-798-0300
South Dade Air Conditioning and Refrigeration, Inc. robin@sdac8a.com 334-872-2228
Hinterland Group Inc. - jrosado@hinterlandgroup.com 561-640-3503
Consolidated Pipe and Supply - josh.hawkins@cpspipe.com 334-610-5142 - Contact for Obtaining Bid Documents
- Download the Plan Order form located in the Bid Advertisement below. Complete the form and return via email to Ashley.Morris@gmcnetwork.com with a scanned copy of your plan deposit check. Check should be mailed to the Mobile, AL office of GMC. No credit cards are accepted.
- Additional Bid Information
- The entire Project Manual does not have to be submitted with the Bid. Do not staple any portion of the bid, all documents should be submitted unbound.
This project is being funded by SRF Project No. CS010915-01 and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after the bid opening. Prime contractor must solicit DBE subcontractors, if they are planning to use subs. DBE solicitations should be documented, preferably with a summary table of DBEs contacted, along with the supporting correspondence (email, letter, etc.) and responses from those subs contacted.
All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States (“American Iron and Steel Requirement”). - Download Documents