GMC, in conjunction with Reynolds, Inc., completed a design-build project for Tenaska, Inc., which constructed two 885-MW generating stations. The generating stations convert natural gas to electric power. Total project cost for the intake facility was approximately $13 million. GMC’s services included planning, design, environmental, and construction monitoring of an MGD pump station and river intake and a 22-mile-30-inch ductile iron pipeline from the Alabama River near Statesville to Billingsley.
GMC is one of the most comprehensive multi-disciplined architecture and engineering firms in the Southeast.
Or email: bids@gmcnetwork.com